Search for what you want to do and follow the steps. Each process shows where it is in the menu, what you need first and which mistakes to avoid.

The life of a project

Warehouse and deliveries

How do I record a transport trip and charge it to the projects?Kilometres at the vehicle's rate, split between the origin and destination projects.

Where BIM › Equipment › TMS › Trips

Before you start

The vehicle with its rate (Fleet Vehicle Price).

How do I record a transport trip and charge it to the projects?

Steps

  1. Click New and choose the vehicle in Equipment: the Driver, the Price and the Begin kilometers are filled in.
  2. Choose the Origin Project project and the Destination Project one and the Date.
  3. Note the odometer's End kilometers: the Quantity is the kilometres.
  4. Click Confirm: the Total is calculated and the reading is saved to the vehicle's Odometer.
Warning

Without a vehicle or projects you get the corresponding warning; if the end reading is lower than the start, “The final kilometres must be greater than the initial ones”.

Site note

With the standard setup, if origin and destination are different projects, each receives half the amount; if it is the same, all of it.

You can confirm several at once with Actions › Confirm.

The project shows its trips on the Shipments button.

Documented version: BIM 2.0 (base_bim_2 20.0.19.04.2026) · Odoo 20