BIM 2.0Odoo 20

Process manual

Search for what you want to do and follow the steps. Each process shows where it is in the menu, what you need first and which mistakes to avoid.

The life of a project

Earned Value

How do I check whether the job is ahead of schedule and making money (CPI and SPI)?Three figures per stage: planned (PV), certified (EV) and actual cost (AC).

Where Budget › Control tab

How do I check whether the job is ahead of schedule and making money (CPI and SPI)?

Steps

  1. Click UPD on the budget.
  2. Open the Control tab.
  3. Click Update Budget.
  4. Review the stage table: certified, actual cost (AC), planned (PV) and variances.
  5. Read the indices: CPI = EV / AC (cost) and SPI = EV / PV (schedule). Above 1 is good.
Warning

If vendor bills with Budget on the line and Include in BIM are missing, the CPI will come out falsely high.

Site note

On the ST tab, the Planning field sets the PV: Uniform or Gantt Planning. Use Gantt: uniform ignores the fact that a job starts slowly.

CPI and SPI are cumulative; CV and SV on screen are for the stage.

Documented version: BIM 2.0 (base_bim_2 20.0.19.04.2026) · Odoo 20