The life of a project

Products and data

How do I prepare the units of measure for BIM and imports?Alternative names to recognize the units in files and a default unit for items.

Where Inventory › Config › Products › Units & Packagings

Before you start

Units of Measure & Packagings option enabled in the Inventory settings.

How do I prepare the units of measure for BIM and imports?

Steps

  1. If you do not see the menu, enable Units of Measure & Packagings in Inventory › Config › Settings.
  2. Go to Inventory › Config › Products › Units & Packagings and open the unit (m, m², m³, h...).
  3. In Alternative names type, separated by commas, the forms in which it arrives in files (for example M,m,mtr,Mtr).
  4. Check Default BIM unit on the unit you want to propose for new items.
  5. Save.
Warning

If a unit in the file matches no name or alternative name, the resource may come in with another unit.

Check only one unit as the BIM default: if there are several, any one of them is used.

Site note

The BC3, Excel and price database importers look up each unit by its name or by its alternative names.

The unit of a resource in the budget is taken from the product Unit when you choose it.

Documented version: BIM 2.0 (base_bim_2 20.0.19.04.2026) · Odoo 20