BIM 2.0Odoo 20

Process manual

Search for what you want to do and follow the steps. Each process shows where it is in the menu, what you need first and which mistakes to avoid.

The life of a project

Site control

How do I configure the inspection and quality register types?The two catalogues required on every line of the quality plan.

Where BIM › Config › Quality

Before you start

BIM Manager profile.

How do I configure the inspection and quality register types?

Steps

  1. Go to BIM › Config › Quality › Inspection Types and create the types you use (visual, lab test, load test…) with their Name.
  2. Go to BIM › Config › Quality › Register Types and create the records that leave evidence (minutes, test report, photo, certificate…).
  3. Go back to the quality plan: you can now choose them on each line.
Warning

Without at least one inspection type and one register type you cannot save any line of the plan: both fields are required.

A type that is already used in a plan cannot be deleted.

Documented version: BIM 2.0 (base_bim_2 20.0.19.04.2026) · Odoo 20