BIM 2.0Odoo 20

Process manual

Search for what you want to do and follow the steps. Each process shows where it is in the menu, what you need first and which mistakes to avoid.

The life of a project

Site control

How do I record and resolve an incident (ticket)?Incidents with priority, owner, solution and final rating.

Where BIM › Execution › Tickets › Tickets

How do I record and resolve an incident (ticket)?

Steps

  1. Click Tickets from the project, or go to BIM › Execution › Tickets › Tickets, and click New.
  2. Write the Title, choose User, Priority and Category (required) and, if applicable, Contact, Classification and Project.
  3. Describe the incident in Observation and attach a file in Attachment; enter the Expected Date.
  4. Click Authorize and then Working.
  5. Write the Observation Solution and click Resolved.
  6. Choose the Qualification (Bad, Regular, Good or Excellent), write the Qualification Note and click Set to Qualified.
Warning

In Working the Observation Solution is required.

Without a Qualification you cannot move to qualified: "Please rate our work so we can improve with your help. Thank you very much." appears.

Open reopens a resolved ticket and adds one to Number of times; it is better to create a new one and link it.

Site note

The customer can also open tickets from the portal, and tickets arrive from web forms.

Use Related Ticket to link a repeated incident to the original.

Documented version: BIM 2.0 (base_bim_2 20.0.19.04.2026) · Odoo 20