BIM 2.0Odoo 20

Process manual

Search for what you want to do and follow the steps. Each process shows where it is in the menu, what you need first and which mistakes to avoid.

The life of a project

Planning and scheduling

How do I assign tasks to the technical team?Tasks per project and budget, with estimated hours, actual hours charged and their cost.

Where BIM › Documentation › Task Report › Task Report

How do I assign tasks to the technical team?

Steps

  1. Go to Documentation › Task Report › Task Report and click New.
  2. Type the Description and assign Project, Budget, Concept and Responsible.
  3. Enter the Estimated Hours (H) and the Prog. Declared %.
  4. In the Timesheets tab the team logs their hours (employee, master Task, date, hours). Real Hours( H), Pending Hours (H), Labor Cost and Prog. Calculated % are calculated.
  5. Move it with Set to Working and Set to Done, or drag it in the board view.
Site note

In Done status the task's hours can no longer be edited.

Documented version: BIM 2.0 (base_bim_2 20.0.19.04.2026) · Odoo 20