Search for what you want to do and follow the steps. Each process shows where it is in the menu, what you need first and which mistakes to avoid.

The life of a project

Users and permissions

How do I make a user see only the projects they follow?With the followers module, seeing a project and its budgets depends on following it.

Where Settings › Users & Companies › Users

Before you start

Administrator role. Bim Followers MFH module installed.

How do I make a user see only the projects they follow?

Steps

  1. Install the Bim Followers MFH module from Apps (remove the Apps filter in the search box to find it).
  2. Open the user and, in the Access Rights tab, find the Bim Follower section.
  3. In the Bim Follower dropdown choose Bim Only Follower. Also keep their profile in the BIM dropdown so they see the app.
  4. Make them a follower of each project they must see: in the project history use Add Followers, or ask them to click Follow.
  5. Save and ask them to reload the page: in projects and budgets they will only see the projects they follow or have created, and their budgets.
  6. For whoever must see all of them with the module installed, choose Bim All Follower.
Warning

With Bim Only Follower, being Supervisor of the project or having BIM User see all documents no longer counts: if they do not follow it or have not created it, they do not see it.

Site note

Users without any option in Bim Follower carry on as usual: what they see is decided by BIM User see owner documents and BIM User see all documents.

Documented version: BIM 2.0 (base_bim_2 20.0.19.04.2026) · Odoo 20