The life of a project

Dashboards (BI)

How do I prepare an income statement summary with formulas?Line report with formulas over budget data, with totals and % for MO, MAT, EQ and SUBC.

Where BIM › Execution › Programming › Income Statement Summary

How do I prepare an income statement summary with formulas?

Steps

  1. Click New, type the Title, choose the Budget and the Date From and Date To dates.
  2. In Lines add each item with its Description and its formula in FT. Give it a Tecnical Name if other lines will use it.
  3. See the syntax in the Formula Documentation tab: references to budget data, to an asset or discount by its code and to other lines.
  4. Click Calculate: it fills Total and Total %, and MO, MAT, EQ and SUBC if their formulas are set.
  5. Optimize View hides the empty columns; Reporte downloads the result to Excel.
  6. When it is correct, click Validate (it moves to Confirmed).
Warning

In Confirmed you cannot edit or calculate: go back to Draft first.

If a formula is badly written, Calculate stops and points out the formula with the error.

Site note

To reuse a model: Export Formulas in one report and Import Formulas in another (with Replace Existing Lines if you want to start from scratch). The Excel only requires the Description column.

From Confirmed you can click Draft to edit it again or Cancel to void it.

Documented version: BIM 2.0 (base_bim_2 20.0.19.04.2026) · Odoo 20