BIM 2.0Odoo 20

Process manual

Search for what you want to do and follow the steps. Each process shows where it is in the menu, what you need first and which mistakes to avoid.

The life of a project

Planning and scheduling

How do I schedule the project in the Gantt chart?Durations, dates and predecessors in a table or by dragging bars.

Where Budget › Gantt button

How do I schedule the project in the Gantt chart?

Steps

  1. In the budget's ST tab, check Type Duration: Date, Performance or Manual.
  2. Click the budget's Gantt button.
  3. Change durations, dates and predecessors in the table or by dragging the bars.
  4. Add concepts without leaving with + Chapter and + Item.
  5. Click Save at the top right.
Warning

Gantt changes are not applied until you click Save.

Adjust replaces the predecessors of all items. Use it only for a first schedule.

With Type Duration set to Performance and items without performance, durations come out as zero. If you only work with dates, choose Date.

Site note

Export the schedule with Excel or PDF, and change the scale with Day, Week, Month.

Documented version: BIM 2.0 (base_bim_2 20.0.19.04.2026) · Odoo 20