BIM 2.0Odoo 20

Process manual

Search for what you want to do and follow the steps. Each process shows where it is in the menu, what you need first and which mistakes to avoid.

The life of a project

Projects

How do I split a project into project objects?Parts of the project (buildings, phases, lots) with their own analytic account, which group spaces, warehouse issues and payment statuses.

Where BIM › Home › Projects › Project Objects

How do I split a project into project objects?

Steps

  1. Go to Home › Projects › Project Objects and click New.
  2. Type the Description and choose the Project. The code is assigned automatically on saving.
  3. If you want to track its costs separately, choose its Cost Center.
  4. In the budget spaces, choose the Object each one belongs to.
  5. Use the object in warehouse issues and in manual payment statuses by objects.
Warning

The Code of a space can only be changed if Edit Code Space is enabled in the BIM 2.0 settings.

If you create a space from the general menu instead of the Spaces button in the budget, the proposed code is always S1.

Site note

Budget reports can be filtered by spaces and by project objects.

Documented version: BIM 2.0 (base_bim_2 20.0.19.04.2026) · Odoo 20