BIM 2.0Odoo 20

Process manual

Search for what you want to do and follow the steps. Each process shows where it is in the menu, what you need first and which mistakes to avoid.

The life of a project

Contracts and subcontracts

How do I prepare the material transfer for a subcontracted item?From the contract line, the Move button creates an internal transfer with the item's storable materials.

Where BIM › Contracts › Contracts

Before you start

Storage Locations enabled in the Inventory settings. Material resources with Track Inventory ticked.

How do I prepare the material transfer for a subcontracted item?

Steps

  1. Open the subcontractor's contract and go to the Lines tab.
  2. On the item's line click Move: a draft internal transfer is created with the item's storable materials, in quantity of the resource × quantity of the item, in the subcontractor's name.
  3. Click the link in the Stock Picking column to open it.
  4. The transfer comes with source and destination at the project location (or the company's first internal location if the project has none): change the destination and the quantities if needed and validate it in Inventory.
Warning

If the item has no materials with Track Inventory you get “The concept … has no storable materials to move.”.

Without Storage Locations enabled in Inventory you get “There is no active internal transfer operation type in the company. Enable Storage Locations in the Inventory settings.”.

Site note

Each time you click Move another transfer is created; the Stock Picking column shows the latest.

Documented version: BIM 2.0 (base_bim_2 20.0.19.04.2026) · Odoo 20