BIM 2.0Odoo 20

Process manual

Search for what you want to do and follow the steps. Each process shows where it is in the menu, what you need first and which mistakes to avoid.

The life of a project

Budgets

How do I enter the measurements of an item?Lines anyone can check: where it is and how much it measures.

Where Item › Measurement tab

How do I enter the measurements of an item?

Steps

  1. Open the item and go to the Measurement tab.
  2. Add one line per location: Space (Block A, basement...) and Description.
  3. Enter Quant (N) (identical units) and Length, Width and Height. Optionally, a Formula.
  4. The Subtotal = N × Length × Width × Height. Empty dimensions count as 1.
  5. The sum of the lines becomes the item quantity.
Site note

Define the project Spaces first: you will then be able to filter how much work there is in each block.

Documented version: BIM 2.0 (base_bim_2 20.0.19.04.2026) · Odoo 20