BIM 2.0Odoo 20

Process manual

Search for what you want to do and follow the steps. Each process shows where it is in the menu, what you need first and which mistakes to avoid.

The life of a project

Maintenance

How do I register an asset and get its QR code?Record for each piece of equipment (lift, pump, boiler) with its QR for labeling.

Where BIM › Maintenance › Data › Assets

Before you start

BIM Maintenance profile.

How do I register an asset and get its QR code?

Steps

  1. Go to BIM › Maintenance › Data › Assets and click New.
  2. Enter the Name, the Code and the Serial; choose the Product if it is in the catalog.
  3. Choose the Location and the Maintenance Task Plan it belongs to.
  4. Enter the Cost, the Date Last Service and the Date Next Service.
  5. Save and open the QR Code tab: print it and stick it on the equipment.
  6. On the URL tab you have the link and a second QR to record readings from your mobile.
Warning

Without a Serial the QR codes are not generated.

The serial number identifies the asset when recording readings: do not repeat it across equipment.

Documented version: BIM 2.0 (base_bim_2 20.0.19.04.2026) · Odoo 20