BIM 2.0Odoo 20

Process manual

Search for what you want to do and follow the steps. Each process shows where it is in the menu, what you need first and which mistakes to avoid.

The life of a project

Warehouse and deliveries

How do I automatically number products by group?Each group has a code and the program assigns the next internal reference in sequence.

Where Inventory › Products › BIM Product Group

How do I automatically number products by group?

Steps

  1. Go to BIM Product Group and create the groups with their Code (number) and Name.
  2. Open the product, Bim tab, and choose the Bim Group.
  3. Leave the internal reference empty and save.
  4. The first product in the group gets the code followed by zeros up to 7 digits (code 12 → 1200000); the following ones, the next number.
Warning

If the group has references with letters that start with the code, the numbering fails on saving.

Site note

It is also at BIM › Inventory › BIM Product Group.

Documented version: BIM 2.0 (base_bim_2 20.0.19.04.2026) · Odoo 20