BIM 2.0Odoo 20

Process manual

Search for what you want to do and follow the steps. Each process shows where it is in the menu, what you need first and which mistakes to avoid.

The life of a project

Prices and unit prices

How do I export a budget to CSV, Excel or ExJson?Get the budget in formats that BIM 2.0 can import back.

Where Budget › Actions › Bim Budget Export

How do I export a budget to CSV, Excel or ExJson?

Steps

  1. Open the budget and click UPD.
  2. Open Actions (gear) and choose Bim Budget Export.
  3. In Export Type choose Budget (CSV), Budget 2000 (Excel), ExJson, Product or Concept Template.
  4. With Product, choose whether you export Price or Cost in Price Type.
  5. Click Export and save the file.
Site note

Budget 2000 has the columns PARTIDA, NAT, UNIDAD, DESCRIPCION DE PARTIDA, MEDICION, PRECIO, IMPORTE, INICIO, FIN, RENDIMIENTO and DURACION: it serves as a model for the Model 2000 importer.

Budget (CSV) is imported back with Concept Template Import, type Budget. ExJson is imported with Import Bim File.

Unit prices are exported the same way from their list: check them and use Actions › Bim Concept Template Export.

Documented version: BIM 2.0 (base_bim_2 20.0.19.04.2026) · Odoo 20