BIM 2.0Odoo 20

Process manual

Search for what you want to do and follow the steps. Each process shows where it is in the menu, what you need first and which mistakes to avoid.

The life of a project

Site control

How do I configure the checklist states?The phases an inspection goes through, who can move it and who is notified.

Where BIM › Config › States › Checklist States

Before you start

BIM Manager profile.

How do I configure the checklist states?

Steps

  1. Go to BIM › Config › States › Checklist States and click New.
  2. Enter the state Name (for example, Pending, Reviewed, Approved).
  3. If only certain people can move a list to that state, add them in Users.
  4. Tick Notify if you want those users to receive an email when a list reaches that state.
  5. Sort the states in the list by dragging them: the first is the one new lists will have.
Warning

Create the states before the first list: a list created without states is left with no state.

If a state has Users, anyone else who tries to set it will see the error “Only users … can move the current checklist to state …”.

With Notify ticked the Users field is required, and only those with an email on their contact receive the message.

Documented version: BIM 2.0 (base_bim_2 20.0.19.04.2026) · Odoo 20