BIM 2.0Odoo 20

Process manual

Search for what you want to do and follow the steps. Each process shows where it is in the menu, what you need first and which mistakes to avoid.

The life of a project

Budgets

How do I create the spaces of a budget?Project zones (blocks, floors, homes) to distribute measurements and request material.

Where Budget › Spaces button

How do I create the spaces of a budget?

Steps

  1. Open the budget and click Spaces.
  2. Click New and type the Name (Block A, Basement, Home 1...). The Code is proposed automatically.
  3. Save. The space can now be chosen on the measurement lines.
  4. From the space, Create Material Request requests material only for that zone.
Site note

All spaces are at Home › Projects › Spaces.

Documented version: BIM 2.0 (base_bim_2 20.0.19.04.2026) · Odoo 20