The life of a project

Products and data

How do I register project elements and their types?Identifiable pieces (columns, beams, panels...) to control materials and work per element.

Where BIM › Execution › Programming › Elements Type / Elements

How do I register project elements and their types?

Steps

  1. In Elements Type create the types with their Name.
  2. In Elements click New and fill in Name and Code. Unit of Measure, Element Type and Project are mandatory.
  3. Note the Volume and the weight (field Weight).
  4. Use the element on the lines of the MTOs and daily reports.
Site note

From the project, the Elements button shows its own.

Documented version: BIM 2.0 (base_bim_2 20.0.19.04.2026) · Odoo 20