BIM 2.0Odoo 20

Process manual

Search for what you want to do and follow the steps. Each process shows where it is in the menu, what you need first and which mistakes to avoid.

The life of a project

Certification and billing

How do I choose the level of detail of a certification invoice?A single descriptive line, only the amount, or the breakdown by chapters and items.

Where BIM › Config › General Config › General Config

Before you start

BIM Administrator profile.

How do I choose the level of detail of a certification invoice?

Steps

  1. Go to Config › General Config › General Config and open the invoice_breakdown key.
  2. In Value type 0: a single line with the project, the certification no. and the period.
  3. Or 1 (default): one line per budget, with the amount only.
  4. Or 2: below the amount, a note with what was certified to date per chapter, the items certified in this payment status and what was certified previously.
  5. Save. It applies to new invoices from payment statuses By Certification.
  6. To redo an invoice already created, open it in draft and click Update content by cert.
Warning

Update content by cert. only works with the invoice in draft and if it comes from a payment status By Certification; otherwise it warns "La factura debe estar en borrador para actualizar su contenido." or "Esta factura no proviene de un estado de pago por certificación."

Documented version: BIM 2.0 (base_bim_2 20.0.19.04.2026) · Odoo 20