BIM 2.0Odoo 20

Process manual

Search for what you want to do and follow the steps. Each process shows where it is in the menu, what you need first and which mistakes to avoid.

The life of a project

Budgets

How do I set up the catalogs to classify items and budgets?Phases, specialties, PCP, work breakdown and budget categories.

Where BIM › Data › Generals

How do I set up the catalogs to classify items and budgets?

Steps

  1. Go to Data › Generals.
  2. Concepts Phase: create the phases and, as children (Parent field), their subphases.
  3. Concepts Specialty: structures, installations, finishes...
  4. PCP: each PCP hangs from a subphase (Parent). Work Breakdown: each line hangs from a PCP.
  5. Budget Categories: they are chosen in the budget's Category field.
  6. In each item, Analysis tab, choose Specialty, Phase, Sub Phase and PCP; each list is filtered by the previous one.
Site note

With the item classified, in Home › Projects › Concepts you can show those columns and group by them.

Documented version: BIM 2.0 (base_bim_2 20.0.19.04.2026) · Odoo 20