BIM 2.0Odoo 20

Process manual

Search for what you want to do and follow the steps. Each process shows where it is in the menu, what you need first and which mistakes to avoid.

The life of a project

Scheduling and progress tracking

How do I record the physical progress and actual dates of an item?Physical progress is what is really done on site; it does not change the certification.

Where Item › Physical Progress (%) · Gantt › % Phys. column

How do I record the physical progress and actual dates of an item?

Steps

  1. In the Gantt type the percentage in the % Phys. column, or in the item form in Physical Progress (%).
  2. With progress above 0 the Actual Start is filled in; at 100 %, the Actual Finish. With 0 they are cleared.
  3. Correct the actual dates if they differ from the planned ones.
  4. Save: started items stay fixed at their actual start and the remaining work is rescheduled from there.
Warning

Physical progress is not the certification: certification is still the basis for invoicing.

Site note

In the Gantt physical progress is the dark stripe at the bottom of the bar; the fill is the certified %.

Documented version: BIM 2.0 (base_bim_2 20.0.19.04.2026) · Odoo 20