BIM 2.0Odoo 20

Process manual

Search for what you want to do and follow the steps. Each process shows where it is in the menu, what you need first and which mistakes to avoid.

The life of a project

Configuration

What inventory and project options do the BIM 2.0 settings have?Project warehouse, mobile warehouse, purchase limits and automatic stage closing.

Where BIM › Config › Configuration

Before you start

BIM Manager profile and Administrator role.

What inventory and project options do the BIM 2.0 settings have?

Steps

  1. Open the Bim 2.0 settings and find the INVENTORY block.
  2. Mobile Warehouse Location: default location for Mobile Warehouse entries. Use Project Warehouse: when you choose the project on a purchase order, the receipt is made in that project's warehouse.
  3. Warehouse Prefix: text placed before the project name when creating its warehouse with the Warehouse button in the project's Stock tab (by default, “ALM”).
  4. Include Picking Cost: material outbounds from the project are proposed with Include for BIM ticked, so they count towards the cost. Picking Move All: if ticked, you can move all the products of a selection at once.
  5. Certificate Chapters: shows the chapter certification button on budgets (the user also needs the Certificate Chapters profile).
  6. Limit Purchase and Project Product Limited: default value of the boxes of the same name on new projects, which control orders against the limits in the Limits tab.
  7. Main Location: new internal locations are created as main; when loading resources in a material request their stock is checked.
  8. Close Stage With Certification: when a certification is validated, its current stage is approved (closed) automatically.
Warning

Sequence by Year changes the numbering of projects and budgets: first read “How do I change the numbering…?”.

Site note

Validate Stock Movements: ticked (by default), movements made from the project and from the mobile warehouse are confirmed and validated automatically; unticked, they stay pending in Inventory.

Tools Inventory Movement: ticked (by default), tool deliveries and withdrawals to employees create their delivery note; unticked, they are only recorded in BIM.

Documented version: BIM 2.0 (base_bim_2 20.0.19.04.2026) · Odoo 20