How do I estimate how the job will finish?Estimated final cost and variance if everything continues as it is.Where Budget › PJ tabStepsOpen the PJ tab of the budget.Review BAC (total budget), EAC (estimated cost at completion), ETC (what remains), VAC (final variance) and TCPI (required efficiency).Compare scenarios: optimistic, realistic and pessimistic. Copy link PDF