What keyboard shortcuts does the tree have?With the focus on the tree, these keys speed up writing a lot.StepsEnter: open the concept.N: add child. Shift + N: add at the same level.Del: delete.Ctrl + C / X / V: copy, cut and paste.Alt + ↑ / ↓: move up or down.R: update the concept. U: update the budget.E / Shift + E: expand or collapse all.Related processes: Copy link PDF