How do I get the written analysis of a stage?The program writes up whether you are ahead or behind and what measures to take.Where Budget › EV tabStepsOpen the EV tab of the budget.Choose the stage (approved or in progress).Read the CPI and SPI with their interpretation, possible causes and measures. Copy link PDF